Case studies

Learn more about the engineering solutions Straker Energy has provided to the marine and energy industry.

Reliability Centered Maintenance (RCM) Analysis and Implementation of a Condition-based Maintenance Program

project information

Oil & Gas Operator

Offshore Installations and an Onshore Oil/Gas processing facility

Europe

What We Did

Completed an RCM study for the plant equipment. These maintenance plans resulted in an efficient condition-based maintenance program.

Results

  • The negotiated annual maintenance expenditure (contract) was reduced to US 400M$ compared to an initial contractor proposal of 2,400M$, as a result of the level of work definition.
  • Resultant maintenance costs are $0.004/mcf compared to $0.04 to $0.05/mcf for other company facilities. A full 90% less. 
  • This work definition also allowed a major reduction in “typical” maintenance staffing plans

Preventative Maintenance Optimization

project information

Oil & Gas Operator

Onshore Gas Processing Plant

Europe

What We Did

  • Maintained leadership endorsement of continuous improvement process
  • Established PM job plans with application of RCM
  • Eliminated recurring failures with RCFA
  • Effective use of CMMS for planning and scheduling

Results

  • Increased compressor reliability from 95.5 to 98+%
  • Increased production 2-4 MMSCFD through better compressor reliability

Maintenance Assessment & Optimization

project information

Oil & Gas Operator

Two Onshore Gas processing facilities

Europe

What We Did

Notable portions of a R&M strategy were implemented, including RCM, condition-based maintenance, RCFA, and a maintenance alliance with a local supplier focused on reliability management and cost efficiency. A follow up maintenance assessment in 2001 confirmed significant improvement.

Results

  • Facility Efficiency over 98.5%
  • Maintenance Cost Reduction of 50%
  • Reliability Analysis (RCM) to: a) reduce maintenance work b) replace instrument calibrations with function tests and c) minimize maintenance work on non-critical equipment

Maintenance Strategy Implementation

project information

Oil & Gas Operator

Onshore Gas Processing Plant

Europe

What We Did

Implementation of an ‘industry leading’ Reliability & Maintenance Strategy which included measurement, analysis and evaluation of the efficiency and effectiveness.

Results

  • Improvements in 6 of 8 Maintenance Assessment Areas
  • Performance over 1 year after strategy implementation
  • Operations Efficiency = 99.95%
  • Production Critical Equipment Reliability = 99.48%
  • Production Critical Equipment Availability = 99.45%
  • SCE work orders overdue = 0
  • Planned vs. Unplanned Work = 98.2%
  • Overdue PMs = 2.2%
  • Facility Availability above 98.8% for six continuous years